Can one valve be both PRV and PSV?
No for code-compliant pressure protection. Keep regulating and safety functions separate unless a certified combination device is specified.
Updated 2026-11-08 · Screening reference — verify against purchaser spec and current standard editions.
Direct answer · PRV vs PSV
Using this chart on a BOQ? Send size · class/PN · MOC · ends · qty for an Ahmedabad quote.
Contact / RFQ WhatsApp| Topic | PRV / pressure reducing | PSV / safety relief |
|---|---|---|
| Purpose | Control downstream pressure | Protect vessel/piping from overpressure |
| Normal state | Modulating / throttling | Closed until set point |
| Sizing basis | Flow + inlet/outlet P + Cv | Orifice letter / API 520/521 or steam codes |
| Set pressure | Outlet set point | Set ≤ MAWP rules per code |
| Common mistake | Using PRV as only overpressure protection | Using PSV to regulate process pressure |
| Field | Why |
|---|---|
| Inlet / outlet pressure | Orifice & spring range |
| Flow (kg/h or t/h) | Capacity |
| Media / superheat | Trim & body MOC |
| End connection | Flanged Class / PN |
| Noise / pilot vs direct | Station design |
| Field | Why |
|---|---|
| Set / CDTP | Spring selection |
| Orifice / API letter | Capacity |
| Overpressure % | Code compliance |
| Backpressure | Conventional vs balanced |
| Fluid state | Steam / gas / liquid |
No for code-compliant pressure protection. Keep regulating and safety functions separate unless a certified combination device is specified.
Provide process data; we quote constructions to the stated orifice/set. Final code sizing remains with the purchaser engineer.
Mark IBR on steam PRV/PSV RFQs for Indian boiler lines.