Valve Documentation & MTC Chart (EN 10204)

Updated 2026-11-08 · Screening reference — verify against purchaser spec and current standard editions.

Direct answer · MTC chart

EN 10204 3.1 is the most common purchaser ask for industrial valves (inspection certificate with heat numbers). 2.1/2.2 are declarations/test reports without full traceability. 3.2 adds purchaser/third-party verification. Pair MTC scope with hydrotest records and GA drawings on the RFQ.

Using this chart on a BOQ? Send size · class/PN · MOC · ends · qty for an Ahmedabad quote.

Contact / RFQ WhatsApp

EN 10204 types

TypeWhat it isTypical valve RFQ use
2.1Declaration of complianceLow criticality utility
2.2Test report (non-specific inspection)Light industrial
3.1Inspection certificate, manufacturer authorized inspectorDefault EPC ask
3.23.1 + purchaser/TPI verificationCritical / owner engineer witness

Document pack checklist

DocumentWhen to ask
GA / sectional drawingAlways for engineered valves
ITP / QAPProject QA
Hydrotest / seat test recordAPI 598 / 6D
Material TC (3.1/3.2)Traceability
NACE / hardness reportSour service
Paint procedureOffshore / export
IBR formsIndian steam

FAQ

Is 3.1 always included?

Often for CS/SS process valves — confirm on the RFQ so it is not assumed for every commercial line.

Difference between MTC and hydro certificate?

MTC covers material chemistry/mechanics; hydro certificate covers pressure test results.

Can TPI be arranged?

Yes when scoped (3.2 / purchaser ITP) on contact.html.

Related charts