Is 3.1 always included?
Often for CS/SS process valves — confirm on the RFQ so it is not assumed for every commercial line.
Updated 2026-11-08 · Screening reference — verify against purchaser spec and current standard editions.
Direct answer · MTC chart
Using this chart on a BOQ? Send size · class/PN · MOC · ends · qty for an Ahmedabad quote.
Contact / RFQ WhatsApp| Type | What it is | Typical valve RFQ use |
|---|---|---|
| 2.1 | Declaration of compliance | Low criticality utility |
| 2.2 | Test report (non-specific inspection) | Light industrial |
| 3.1 | Inspection certificate, manufacturer authorized inspector | Default EPC ask |
| 3.2 | 3.1 + purchaser/TPI verification | Critical / owner engineer witness |
| Document | When to ask |
|---|---|
| GA / sectional drawing | Always for engineered valves |
| ITP / QAP | Project QA |
| Hydrotest / seat test record | API 598 / 6D |
| Material TC (3.1/3.2) | Traceability |
| NACE / hardness report | Sour service |
| Paint procedure | Offshore / export |
| IBR forms | Indian steam |
Often for CS/SS process valves — confirm on the RFQ so it is not assumed for every commercial line.
MTC covers material chemistry/mechanics; hydro certificate covers pressure test results.
Yes when scoped (3.2 / purchaser ITP) on contact.html.