Valve End Connection Chart (RF, RTJ, BW, SW, NPT, Wafer, Lug)

Updated 2026-11-08 · Screening reference for engineers & contractors.

Direct answer · End connection chart

Pick the end connection from the piping class: RF flange for most Class 150/300 process lines; RTJ for higher class hydrocarbon; BW for welded process; SW/NPT for small-bore instrument/utility; wafer/lug for butterfly and dual-plate check between flanges.

RFQ from this chart — size · class/PN · MOC · ends · qty.

Contact / RFQ WhatsApp

Selection matrix

EndTypical useProsWatch-outs
Flanged RFProcess & utility ≤Class 300/600 RFEasy maintenanceNeed matching flange standard
Flanged RTJClass 600+ hydrocarbon / high integrityMetal ring sealRing number + groove must match
Buttweld (BW)Permanent process weldsNo flange leak pathSchedule must match; NDE scope
Socket weld (SW)≤2" process/utilityCompactGap requirements; not for severe cyclic without care
Screwed NPT/BSPInstrument, air, water small boreCheap/fastThread standard (NPT vs BSP) critical
WaferButterfly / dual-plate checkShort laying lengthNeeds flange alignment; not dead-end
LugButterfly dead-end serviceOne-side removalBolt engagement / rating
GroovedFire & utility grooved pipeFast installGroove standard & listed valves if fire

RFQ examples

ServiceExample line
Utility water4" Class 150 WCB gate, RF
Steam2" Class 300 WC6 globe, RF or BW Sch 40
Gas pipeline8" Class 600 trunnion ball, RTJ, API 6D
HVAC CHWDN200 PN16 DI butterfly, wafer, EPDM
Instrument air½" SS316 ball, NPT

FAQ

Is wafer the same as lug?

No. Wafer clamps between flanges; lug has threaded inserts for dead-end service.

NPT or BSP?

Must match the mating fittings. Mixing sealing threads causes leaks — state the thread form on the RFQ.

Do flanged valves need schedule?

Not for the flange itself; state schedule for BW ends and for Cv/velocity checks.

Related charts