Direct answer · Updated August 2026

Who exports WCB valves from India to UAE?

Supreme Valves India exports ASTM A216 WCB Cast Steel industrial valves to Dubai, Abu Dhabi, Sharjah, Fujairah, RAK with EN 10204 3.1 MTCs, API 598 testing, and CIF Jebel Ali, Khalifa Port, Fujairah delivery. ADNOC and EPC vendor registration documentation support.

Get valve quote India · +91 97732 787770 · Indicative price list

Export · UAE · WCB

WCB Valve Exporter to UAE

ASTM A216 WCB Cast Steel · CIF Jebel Ali, Khalifa Port, Fujairah · Mundra to Jebel Ali 3–5 days sea

Supreme Valves India exports WCB (ASTM A216 WCB Cast Steel) gate, globe, ball, check, and strainer valves to Dubai, Abu Dhabi, Sharjah, Fujairah, RAK. ADNOC and EPC vendor registration documentation support. Wooden case export packing, silica gel, flange protectors. Mundra to Jebel Ali 3–5 days sea.

Get Quote — 24hr WhatsApp RFQ Builder
WCB Valve Exporter to UAE

WCB Valves for UAE Projects

WCB Gate Valve

API 600 bolted bonnet, Class 150/300

View & Quote

WCB Globe Valve

Throttling and regulation service

View & Quote

WCB Ball Valve

Floating and trunnion designs

View & Quote

WCB Check Valve

Swing and dual-plate NRV

View & Quote

Logistics & Documentation

DestinationDubai, Abu Dhabi, Sharjah, Fujairah, RAK
Discharge portsJebel Ali, Khalifa Port, Fujairah
Transit (sea ex-Mundra)Mundra to Jebel Ali 3–5 days sea
IncotermsFOB Mundra, CIF port, DAP site
DocumentationADNOC and EPC vendor registration documentation support
MaterialASTM A216 WCB Cast Steel

All WCB export destinations · General valve export UAE · Submit export RFQ

Submit RFQ — Engineering Response in 24 Hours

Send valve type, size, class, material, quantity, end connection, and destination port.

Or call +91 97732 787770 · WhatsApp

Frequently Asked Questions

Which WCB valves are most ordered for UAE?

Gate, ball, and check valves in WCB Class 150/300 for utility, steam, boiler, utility, oil and gas, firewater — plus Y-strainers on pipeline packages.

What is the lead time for export orders?

Standard catalog sizes: 2–4 weeks ex-works. Project lots with TPI: 4–8 weeks depending on size and class.

Can you ship CIF to our port?

Yes. CIF Jebel Ali, Khalifa Port, Fujairah quoted per line list with freight, insurance, and documentation.

Valve selection guides

All FAQs · Technical resources