What if TDS_fw ≥ TDS_max?
Treatment is wrong — blowdown formula breaks down. Fix chemistry first.
Updated 2026-11-10 · Screening tool · Verify against current standards before design freeze.
Direct answer · What this calculator does
Got a size from this tool? Send type · size · Class/PN · MOC · ends · qty.
Contact / RFQ Quote page WhatsApp| Stream | Typical valve | Notes |
|---|---|---|
| Continuous BD | Globe / angle | Throttling, flashing risk |
| Intermittent BD | Gate / angle / plunger | Quick open, erosion trim |
| Isolation upstream | Gate | Full bore, IBR as required |
Treatment is wrong — blowdown formula breaks down. Fix chemistry first.
Often routed through a flash vessel / heat recovery. Valves still see two-phase flow — specify for flashing service.
Many codes / practices use dual isolation or a combination of regulating + isolation — follow the boiler package spec.
Supreme Valves India supplies constructions by size, rating, MOC and ends. Outputs are screening aids, not certified design.