Why Giga-Project EPCs Source from Supreme Valves
SABER & SASO Ready
Every shipment includes SABER PCoC and SASO conformity documentation for clearance at Duba, Jeddah Islamic Port, or King Abdullah Port. We manage the certification workflow so your logistics team does not have to.
Seawater & Desalination Metallurgy
NAB C95800, super duplex S32750/S32760, SS316L, and rubber-lined valves engineered for SWRO desalination intake, brine reject, and district cooling seawater circuits on the Red Sea coast.
Project-Scale Supply
Line-list RFQs priced within 24-48 hours. Staggered call-off deliveries matched to construction schedules, with consolidated container shipments and marine-grade export packing.
Full Documentation Pack
EN 10204 3.1 MTCs, API 598 test reports, PMI, NACE MR0175 compliance certificates, coating reports, and ITP sign-off supporting third-party inspection by Lloyds, BV, TUV, or SGS.
Valve Packages for NEOM & Red Sea Scopes
Desalination & Water Transmission
Large-bore butterfly (API 609 / AWWA C504 pattern), knife gate, and non-slam check valves in duplex, NAB, and rubber-lined ductile iron. DN50 to DN1800.
District Cooling
Butterfly, balancing, and check valves for DCP networks. EPDM/PTFE seats, class PN10-PN25, with electric actuation options for plant rooms.
Utilities & Firewater
UL/FM gate (OS&Y), alarm check, and deluge system valves plus hydrant equipment for giga-project fire protection networks.
Hydrogen & Energy
High-integrity ball and globe valves for green hydrogen and power infrastructure — API 6D, fire-safe API 607, SIL-rated actuated packages.
Process & Plant
API 600 gate, BS 1873 globe, API 594 dual-plate check, strainers, and steam traps for industrial scopes across Oxagon manufacturing zones.
Actuated Packages
Pneumatic and electric actuated valves with ISO 5211 mounting, ATEX/IECEx options, limit switches, and positioners — assembled and function tested.
Project Zones We Support
- NEOM — The Line & Oxagon — utilities, industrial, and marine works
- Trojena — mountain water storage and snowmaking infrastructure
- Sindalah Island — marina and hospitality utilities
- ENOWA — water, energy, and hydrogen infrastructure
- Red Sea Global — resort desalination and district utilities
- AMAALA — coastal utility networks
- King Abdullah Economic City — industrial valley plants
- EPC contractors — mobilised on Vision 2030 packages
Frequently Asked Questions
Can you supply valves against NEOM project specifications?
Which Saudi ports do you ship to for NEOM and Red Sea projects?
Do you supply seawater-service valves for Red Sea desalination plants?
What is your minimum order for giga-project contractors?
Can you meet fast-track construction schedules?
Related Pages
Need valves delivered to NEOM & Red Sea Projects?
Get a detailed technical enquiry within 4 business hours.