Why LNG Project Buyers Choose Supreme Valves
Cryogenic Capability
Extended-bonnet gate and globe valves for LNG and cold box service down to -196°C, with LCB/LC3 and SS316 bodies, cryogenic testing per BS 6364, and PTFE/PCTFE trim options.
Sour & Fire-Safe Service
NACE MR0175/ISO 15156 compliant materials for North Field sour gas streams. Fire-safe ball valves certified to API 607/ISO 10497 with anti-static and blow-out proof stem design.
Qatar Submittal-Ready Documents
Vendor document packages formatted for Qatar EPC submittals: ITPs, EN 10204 3.1 MTCs, API 598/6D test reports, weld maps, NDE reports, and TPI release by Lloyds, BV, or TUV.
Fast Gulf Logistics
Mundra to Hamad Port in 3-5 days. CIF/DDP Ras Laffan available. Consolidated project shipments plus air-freight for shutdown-critical items via Doha.
Valve Scope for Qatar LNG & Ras Laffan
Cryogenic Valves
Extended bonnet gate, globe, and check valves for LNG liquefaction, storage, and loading. BS 6364 cryo-tested. LCB, LC3, SS316.
Pipeline Ball Valves
API 6D trunnion and floating ball valves, double block & bleed, full bore, for gas gathering and export pipelines.
Process Gate & Globe
API 600 gate and BS 1873 globe valves in WCB, LCB, SS316, duplex for amine, sulfur recovery, and utility units.
Seawater Cooling
NAB C95800 and super duplex butterfly and check valves for once-through seawater cooling at Ras Laffan.
Actuated & ESD Packages
Pneumatic and electric actuated valves, SIL 2/3 capable, ATEX/IECEx certified accessories, partial stroke test options.
Utility & Firewater
UL/FM fire protection valves, strainers, steam traps, and instrument valves for balance-of-plant scopes.
Projects & Operators We Support in Qatar
- QatarEnergy LNG — North Field East & South expansion trains
- Ras Laffan Industrial City — common utilities and offplots
- Qatar Gas processing facilities — brownfield upgrades
- Mesaieed Industrial City — downstream and chemicals
- EPC contractors — Technip Energies, CTJV consortiums, Samsung C&T
- Package vendors — skid builders and module yards feeding Qatar sites
- Kahramaa — water and power utility networks
- Maintenance contractors — shutdown and call-off supply
Frequently Asked Questions
Do you supply cryogenic valves suitable for LNG service in Qatar?
Can your valves comply with NACE MR0175 for North Field sour gas?
What is the delivery time from India to Ras Laffan?
Do you support EPC vendor document requirements for Qatar projects?
Can you supply against a QatarEnergy approved-vendor requirement?
Related Pages
Need valves delivered to Ras Laffan & Qatar LNG Sites?
Get a detailed technical enquiry within 4 business hours.