United States Export Program

Alloy 20 Valves for the United States

Full Alloy 20 (UNS N08020 / ASTM A351 CN7M) gate, globe, ball, and dual-plate wafer check valves — exported from India with DAP delivery, USD invoicing, and EN 10204 3.1 material traceability.

Request Quote (USD) WhatsApp

Why buy Alloy 20 valves from India? Indian-manufactured valves avoid the 25% Section 301 tariffs on Chinese-origin valves (HTSUS 8481). Supreme Valves delivers full CN7M construction with air freight included — proven DAP shipments to Saint George, Utah and mining operations across the Southwest.

US Regional Supply Pages

Utah & Arizona Mining

Copper heap leaching, SX-EW raffinate loops, sulfuric acid distribution. Salt Lake City, Tucson, Phoenix, Saint George.

Salt Lake City & Tucson → · Saint George →

Texas Gulf Coast

Petrochemical, sulfuric acid dilution, alkylation units. Houston, Pasadena, Baytown, Beaumont.

Houston, Texas →

Louisiana Chemical

Mississippi River chemical corridor. Baton Rouge, Geismar, Lake Charles.

Baton Rouge →

Florida Fertilizer

Phosphate processing, sulfuric acid absorption, phosphoric acid transfer. Tampa Bay corridor.

Tampa, Florida →

Nevada Copper Mining

Heap leach raffinate, SX-EW circuits. Elko, Battle Mountain, Reno.

Nevada Mining →

Phoenix, Arizona

Copper belt distributors and mine MRO. Phoenix Sky Harbor (PHX).

Phoenix →

El Paso, Texas

Southwest distribution hub for mining and acid service.

El Paso →

Chicago, Illinois

Midwest fertilizer and phosphoric acid plants.

Chicago →

All USA Markets

General industrial valve export to all 50 states. API/ASME compliance, MTC 3.1.

USA Export Hub →

Featured Product: Dual-Plate Wafer Check Valve

Our most-requested Alloy 20 valve for US buyers — full UNS N08020 construction per the specification below:

Case study: DAP delivery to Saint George, Utah →

View Dual-Plate Wafer Check Valve Product Page →

Technical Resources

Get Alloy 20 Valve Pricing in USD

Submit NPS size, pressure class, valve type, and quantity. Response within 24 hours.

Configure RFQ